Warning: is_file(): open_basedir restriction in effect. File(/templates/system/css/system.css) is not within the allowed path(s): (/var/www/vhosts/sab-nord.de/:/tmp/) in /var/www/vhosts/sab-nord.de/vigorous-galileo.162-55-29-102.plesk.page/libraries/joomla/filesystem/file.php on line 630

Sidebar

MLRS separating station

  • Semi-automatic plant
  • Automatic extraction of MLRS-rockets from the rocket pod
  • Manual removal of the detonator and the expelling charge
  • Sawing process for separationg the rocket motor from the warhead
  • Barcode marking for tracing warheads
  • Semi-automatic plant
  • Remote maintenace
  • Connected load: 8 kW
  • Weight: 9,8 t
  • Mode of operation: 24/7/365 days
  • Manufacturer of the drive system: SEW
  • Manufacturer of the control system: Siemens S7